CIP For Esmeraldas Project In Ecuador,

logo


CIP For Esmeraldas Project In Ecuador

    Esmeraldas Refinery Rehabilitation Project Phase II is located in Petroindustrial Industrial Complex in Esmeraldas, Nothern Ecuador. The factory was built in 1977 to be able to produce 55 thousand barrels.

    After two extensions of facilities in 1987 and 1997, the factory was able to produce 110 barrels. However, its refining capacity has decreased because of obsolete equipments

    In order to solve this problem, Petroecuador is planning to take two-step repair processes. SK Construction will take charge in the first step to repair FCC factory and perform a thorough examination on other refinery facilities. This project completed on late October, 2011.

    KOVIS E&C awarded the Chemical Dosing System For Esmeraldas Project in Ecuador. Contractor: SK Engineering and Construction. Quantity: 12 packages. Time for completing project is 7 months (from December 1st 2010 to June 30th 2011).

Kovis



HAPPINESS – PASSION - DREAM

Office

6th floor - VIPD Building, No. 4 Nguyen Thi Minh Khai Str., Da Kao Ward, District 1, Ho Chi Minh City, Viet Nam

Tel   : +84-28-3911 7211 / 12

Fax : +84-28-3911 7213

Factory

Workshop 4A, Road N4, Vinatex- Tan Tao I.P, Phuoc An Com., Nhon Trach Dist., Dong Nai Prov., Vietnam
language